AZE | RUS | ENG |

Ads

"Kaspi" publications

TAP reinstates 89% of route in Greece, Albania

TAP reinstates 89% of route in Greece, Albania
Around 89 percent of the Trans Adriatic Pipeline (TAP) route has been reinstated in Greece and Albania, Trend reports citing a message from TAP AG consortium. "TAP is reinstating around 89 percent of route in Greece and Albania (685 kilometers out of 765 kilometers in total),” said the consortium. Land parcels are returned to owners and users to resume agriculture activities, reads the message. TAP project, worth 4.5 billion euros, is one of the priority energy projects for the European Union (EU). The project envisages transportation of gas from Azerbaijan's Shah Deniz Stage 2 to the EU countries. Connecting with the Trans Anatolian Pipeline (TANAP) at the Greek-Turkish border, TAP will cross Northern Greece, Albania and the Adriatic Sea before coming ashore in Southern Italy to connect to the Italian natural gas network. The project is currently in its construction phase, which started in 2016. Once built, TAP will offer a direct and cost-effective transportation route opening up the vital Southern Gas Corridor, a 3,500-kilometer long gas value chain stretching from the Caspian Sea to Europe. TAP shareholders include BP (20 percent), SOCAR (20 percent), Snam S.p.A. (20 percent), Fluxys (19 percent), Enagás (16 percent) and Axpo (5 percent).

Paylaş:

Facebook-da

Reklam

News feed

Exchange Rates

Tipi Ədə. Adı AZN
USD 1 1 ABŞ dolları 1.7
EUR 1 1 Avro 1.9288
GEL 1 1 Gürcüstan larisi 0.6337
GBP 1 1 İngiltərə funt sterlinqi 2.2567
IRR 100 100 İran rialı 0.004
SEK 1 1 İsveç kronu 0.1842
CHF 1 1 İsveçrə frankı 1.6988
KWD 1 1 Küveyt dinarı 5.6004
TRY 1 1 Türkiyə lirəsi 0.311