AZE | RUS | ENG |

Ads

"Kaspi" publications

Opening date of SOCAR’s STAR refinery disclosed

Opening date of SOCAR’s STAR refinery disclosed
The official opening ceremony of STAR refinery, owned by the Azerbaijani state oil company SOCAR, is scheduled for October 19, SOCAR Turkey Energy told Trend.
Earlier, it was reported that STAR refinery will reach its full production capacity in January 2019.
The STAR refinery will produce naphtha, diesel fuel with ultra-low sulfur content, aviation kerosene, petroleum coke, liquefied gas and other products. The refinery will not produce gasoline and fuel oil.
The plant is planned to carry out processing of oil of such grades as Azeri Light, Kerkuk and Urals.

The refinery's processing capacity will amount to 10 million tons of products per year.
Today, the share distribution in the project is as follows: 60 percent of shares are owned by the Rafineri Holding company (being in 100-percent possession of SOCAR Turkey Energy company), which previously bought all 18.5 percent of the participation interest of Turcas Petrol company in the project, and 40 percent of shares are owned by SOCAR company.

Paylaş:

Facebook-da

Reklam

News feed

Exchange Rates

Tipi Ədə. Adı AZN
USD 1 1 ABŞ dolları 1.7000
EUR 1 1 Avro 1.9335
GEL 1 1 Gürcüstan larisi 0.6368
GBP 1 1 İngiltərə funt sterlinqi 2.1717
IRR 100 100 İran rialı 0.0040
SEK 1 1 İsveç kronu 0.1891
CHF 1 1 İsveçrə frankı 1.7124
KWD 1 1 Küveyt dinarı 5.5898
TRY 1 1 Türkiyə lirəsi 0.3185