AZE | RUS | ENG |

Ads

"Kaspi" publications

Opening date of SOCAR’s STAR refinery disclosed

Opening date of SOCAR’s STAR refinery disclosed
The official opening ceremony of STAR refinery, owned by the Azerbaijani state oil company SOCAR, is scheduled for October 19, SOCAR Turkey Energy told Trend.
Earlier, it was reported that STAR refinery will reach its full production capacity in January 2019.
The STAR refinery will produce naphtha, diesel fuel with ultra-low sulfur content, aviation kerosene, petroleum coke, liquefied gas and other products. The refinery will not produce gasoline and fuel oil.
The plant is planned to carry out processing of oil of such grades as Azeri Light, Kerkuk and Urals.

The refinery's processing capacity will amount to 10 million tons of products per year.
Today, the share distribution in the project is as follows: 60 percent of shares are owned by the Rafineri Holding company (being in 100-percent possession of SOCAR Turkey Energy company), which previously bought all 18.5 percent of the participation interest of Turcas Petrol company in the project, and 40 percent of shares are owned by SOCAR company.

Paylaş:

Facebook-da

Reklam

News feed

Exchange Rates

Tipi Ədə. Adı AZN
IRR 100 İran rialı 0.0040
GEL 1 Gürcü larisi 0.6308
GBP 1 İngilis funt sterlinqi 2.2135
TRY 1 Türk lirəsi 0.3020
KWD 1 Küveyt dinarı 5.6066
SEK 1 İsveç kronu 0.1881
EUR 1 Avro 1.9479
CHF 1 İsveçrə frankı 1.7064
USD 1 ABŞ dolları 1.7000